Sign in Subscribe

Water Pollution Control Authority approves six-month sewer moratorium

Water Pollution Control Authority · Meeting of May 5, 2026

CT EAST HAMPTON — East Hampton Water Pollution Control Authority votes to halt sewer expansion. Chair Jack Solomon and the board voted 4-0 to impose a six-month moratorium on new sewer connections and flow increases, citing the need to review treatment facility capacity and coordinate with the town's updated plan of conservation and development. The moratorium will exempt existing Master Plan projects and single-family residents already served by sewer lines.

Town Manager David Cox will draft amendments to Town Code Chapter 264 to allow property owners to repair septic systems rather than connect to municipal sewer, except for new construction. The Authority approved a Developer's Permit Agreement with Belltown 30 LLC and Investment LLC for an eight-inch sewer extension at 30 Long Crossing and 8 Aldens Crossing, with a 15,000 dollar deposit for construction observation.

In the full story:

  • The complete report — 408 words

Source: the Water Pollution Control Authority meeting of May 5, 2026, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to The East Hampton CT Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The East Hampton CT Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe